Citation Matching

{{ wayPoint.label }}

{{ wayPoint.label }}

Project 35867 – Task 1102771

Instructions: Identify the Control, if it exists, to which the Citation should be mapped. Task Description: Match the "3.4.1 9." Citation to a Control Authority Document URL: Website URI Document URI

Citation Reference: 3.4.1 9.

Citation Guidance: The infrastructure used to support the ZTA access decision process should be made scalable to account for changes in process load. The PE(s), PA(s), and PEPs used in a ZTA become the key components in any business process. Delay or inability to reach a PEP (or inability of the PEPs to reach the PA/PE) negatively impacts the ability to perform the workflow. An enterprise implementing a ZTA needs to provision the components for the expected workload or be able to rapidly scale the infrastructure to handle increased usage when needed.

Compare Guidance Text

The new guidance differs from the current guidance, see below:
The new guidance is identical to the current guidance.

Control Matches

Why are you sending the task back? (optional)